You're currently viewing our forum as a guest. This means you are limited to certain areas of the board and there are some features you can't use. If you join our community, you'll be able to access member-only sections, and use many member-only features such as customizing your profile, sending personal messages, and voting in polls. Registration is simple, fast, and completely free.


Join our community!


If you're already a member please log in to your account to access all of our features:

Username:   Password:
Add Reply
Working Principle of Cement Silo and Composition; Working Principle of Cement Silo and Composition
Topic Started: Sep 15 2014, 03:17 AM (66 Views)
* jinyajing

Once blocked bags concrete batching equipment, compartment pressure exceeds the warehouse roof safety pressure relief valve pressure, the pressure relief valve to open releasing compartment pressure and prevent warehouse explosion accidents. Through high and low material level can be observed in full and the lack of material warehouse.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:js500 twin shaft concrete mixer,etc. We will provide you with the best product and service.

When discharge is required, first open the manual discharge valve at the bottom of the cone, and then the cement out of conveying means conveying cement. In the process of discharge, if has the " bagging " phenomenon , the timely broken arch pressing solenoid valve to perform the blowing , eliminating the " camber " in the feed beton mixer, to ensure smooth supply of cement .When the cement delivery device fails, the first close discharge cone at the bottom of the manual valve to prevent cement spill, resulting in waste .

Notes of cement silo: The installation process, the non warehouse body tilt, leg deformation. The bottom of the legs and basic welding firmly embedded parts. Good wind, lightning work. Strictly prohibit strong impact leg and body positions. Regular inspection of cement dust bag attachment, and timely clean-up. The foundation must be solid SICOMA concrete mixer, consistent architectural design specification. Production notes: The company produced a storage bin in line with industry standards.